About

Home Page // About

The local VLAN configuration is updated only when an update that has a higher dumpinside ciscoexampdf.com

Established in 1951 from a family having now 73 years experience in mechanical machinery and construction;

F.lli RIGHINI, based in Ravenna, Italy, is an engineering and manufacturing company operating in the offshore market since 1985.

A leading offshore provider of technology with problem solving aKtude and tailor made capabili?es to respond to client’s needs and expecta?ons

F.lli RIGHINI brand is known in the offshore industry for a large portfolio of products and solutions such as:

  • pipe laying and handling systems
  • friction clamps for J-lay up to 1500 mT capacity
  • rotary and linear winches for mooring and riser pull-in
  • chain-jacks for mooring and SCR pull-in
  • fairleads and chain-stoppers for FPSO mooring chain
  • laying systems for flexibles and umbilicals
  • davit cranes for tie-in
  • subsea trenching machines
  • bear cages and pile lifting tools (ILTs, ELTs)
  • electric or Diesel hydraulic power units
  • control systems
  • any type of taylor made installation aids

F.lli RIGHINI has the capability to support the Customer since the early stages of design for lay-out  definition and optimization. Based on many years of expertise and the amount of delivered systems we can help our Customers to focus on the best possible solutions for their needs.

Complete in-house engineering, manufacturing and testing contribute to evolve field-proven concepts to new solutions in order to face the most severe requirements of the offshore industry.

3D modeling and Finite Element analyses are carried out as a standard practice for weight optimization and project reliability. On every project we work in close cooperation with Class Societies such as DnV, ABS, BV, RINA for certification of design, manufacturing and testing of our equipment.

All our equipment undergoes functional and load testing at F.lli RIGHINI factory prior to delivery. Facilities for static and dynamic load testing are available up to several hundred tons, depending on the application.

Every kind of pipe laying and handling equipment can be supplied from pipe storage to the firing line:

  • conveyors, elevators, rollers, line-up equipment for double to quadruple joint systems
  • friction clamps for J-lay up to 36“ pipe diameter and 1500 mT capacity
  • tilting tables with hang-off clamps up to 1500 mT capacity
  • control system with man-machine-interfaces
  • containerized hydraulic power units (Diesel-driven or by AC motors)

Throughout the years F.lli RIGHINI has designed, manufactured, tested and installed mooring and risers pull-in equipment on board of FPSOs such as chain jacks, hydraulic drum winches, fairleads and deflection sheaves.

Pull-in equipment can be designed on integrated self-displacing modules, equipped with chain lockers, auxiliary winches and hoists, electric or Diesel driven hydraulic power units and control rooms.

  • chain jacks
  • linear winches
  • hydraulic drum

We can provide ATEX Zone 1 and 2 equipment with certification also covering machinery and power units. Equipment has been successfully delivered for projects such as Bonga, Ehra, Akpo, Usan, Cidade de Paraty, CLOV, Quad204.

F.lli RIGHINI can also provide tailor-made solutions for flexible pipes and umbilicals deepwater lay, including:

  • lay towers with tensioners
  • carousels
  • spooling tower with tensioner
  • A&R traction winches and storage drums
  • complete control and supervision systems
  • integration of third party equipment

Several shipsets of davit cranes have been delivered for sealine repair and tie-in up to 100 mT SWL.  Cranes are self-contained and skid-mounted, with integrated HPU and control console. The crane compact dimensions allow for road transport on a standard flat trailer.

F.lli Righini is specialized in design and fabrication of special equipment and systems for jackets-platforms decommissioning like for example in 2017 the Murchison Platform removal in the North Sea, for which it provided 4 tubular external lifting tools of 2.000t capacity each, for the lifting of 2 semi-jackets of 7.000t.

Whenever required F.lli RIGHINI can provide assistance to the Clients for installation, commissioning and start-up activities at yards or offshore covering various disciplines (mechanical, hydraulics, electrical, controls/software). Personnel can be also provided for operating our equipment during offshore campaigns.

F.lli RIGHINI can provide overhaul, upgrade or modification of the equipment in service.

.

 

QUESTION 1 You are managing a SharePoint farm in an Active Directory Domain Services (AD DS) domain. You need to configure a service account to use domain credentials. What should you do first? A. Configure the service account to use a domain user account. B. Register the domain credentials in the Farm Administrators group. C. Configure the service account to use a local user account. D. Register the domain credentials as a SharePoint managed account. Correct Answer: D Explanation QUESTION 2 A company named Contoso, Ltd. has a SharePoint farm. The farm has one Search service application configured. The Search service application contains five crawl databases, all of which contain content. Contoso plans to crawl knowledge base content from its partner company Litware, Inc. The knowledge base content must be stored in a dedicated crawl database. You need to configure crawling. What should you do? A. Add a crawl database that contains the Litware knowledge base to the existing Search service application. B. Provision a new Search service application. Configure the service application to crawl the Litware knowledge base content. C. Set the MaxCrawlDatabase parameter to 6. D. Create a dedicated Microsoft SQL Server instance for the Litware crawl database. Correct Answer: B Explanation Explanation/Reference: The maximum number of crawl databases is 5 per Search service application so we need another Search service application. This maximum limit is increased to 15 with an Office 2013 update but the question doesn't mention that this update is installed so we have to assume the question was written before the update was released. QUESTION 3 A company uses SharePoint 2013 Server as its intranet portal. The Marketing department publishes many news articles, press releases, and corporate communications to the intranet home page. You need to ensure that the Marketing department pages do not impact intranet performance. Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) A. In Central Administration, set up a User Policy for the Super User and Super Reader accounts. B. Configure IIS to use the Super User and Super Reader accounts for caching. C. Use the Farm Configuration Wizard to configure the Super User and Super Reader accounts. D. Use Windows PowerShell to add the Super User and Super Reader accounts. Correct Answer: AD Explanation Explanation/Reference: A: The way to correct this problem is to first create two normal user accounts in AD. These are not service accounts. You could call them domain\superuser and domain\superreader, but of course that's up to you. The domain\superuser account needs to have a User Policy set for that gives it Full Control to the entire web application. D: If you are using any type of claims based authentication you will need to use Windows PowerShell. And Windows PowerShell is the hipper more modern and sustainable option anyway. If you are using classic mode authentication run the following cmdlets on one of your SharePoint servers: $w = Get-SPWebApplication "http:///" $w.Properties["portalsuperuseraccount"] = "domain\superuser" $w.Properties["portalsuperreaderaccount"] = "domain\superreader" $w.Update() If you are using claims based authentication run these cmdlets on one of your SharePoint servers: $w = Get-SPWebApplication "http:///" $w.Properties["portalsuperuseraccount"] = "i:0#.w|domain\superuser" $w.Properties["portalsuperreaderaccount"] = "i:0#.w|domain\superreader" $w.Update() Note: * If you have a SharePoint Publishing site and you check the event viewer every once in a while you might see the https://www.pass4itsure.com/70-331.html following warning in there: Object Cache: The super user account utilized by the cache is not configured. This can increase the number of cache misses, which causes the page requests to consume unneccesary system resources. To configure the account use the following command 'stsadm -o setproperty -propertynameportalsuperuseraccount -propertyvalue account -urlwebappurl'. The account should be any account that has Full Control access to the SharePoint databases but is not an application pool account. Additional Data: Current default super user account: SHAREPOINT\system This means that the cache accounts for your web application aren't properly set and that there will be a lot of cache misses. If a cache miss occurs the page the user requested will have to be build up from scratch again. Files and information will be retrieved from the database and the file system and the page will be rendered. This means an extra hit on your SharePoint and database servers and a slower page load for your end user. Reference: Resolving "The super user account utilized by the cache is not configured." QUESTION 4 You are managing a SharePoint farm. Diagnostic logs are rapidly consuming disk space. You need to minimize the amount of log data written to the disk. Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) A. Set the log event level to Information. B. Set the log event level to Verbose. C. Set the log trace level to Medium. D. Set the log trace level to Verbose. E. Set the log event level to Warning. F. Set the log trace level to Monitorable. Correct Answer: EF Explanation Explanation/Reference: E: Event Levels Warning, Level ID 50 Information, Level ID: 80 Verbose, Level ID: 100 F: Trace levels: Monitorable: 15 Medium: 50 Verbose: 100 Note: When using the Unified Logging System (ULS) APIs to define events or trace logs, one of the values you must supply is the ULS level. Levels are settings that indicate the severity of an event or trace and are also used for throttling, to prevent repetitive information from flooding the log files. Reference: Trace and Event Log Severity Levels QUESTION 5 A company's SharePoint environment contains three web applications. The root site collections of the web applications host the company intranet site, My Sites, and a Document Center. SharePoint is configured to restrict the default file types, which prevents users from uploading Microsoft Outlook Personal Folder (.pst) files. The company plans to require employees to maintain copies of their .pst files in their My Site libraries. You need to ensure that employees can upload .pst files to My Site libraries. In which location should you remove .pst files https://www.pass4itsure.com/70-342.html from the blocked file types? A. The File Types area of the Search service application section of Central Administration B. The General Security page in the site settings for the site collection C. The Blocked File Types page in the site settings for the site collection D. The General Security section of the Security page of Central Administration Correct Answer: D Explanation